drop down menu by Css3Menu.com

The route starts at Tywyn, Wharf and depicts the station buildings and surrounding features including the Wharf Station building extension opened in April 2005. Included is the new Weighbridge building and slate wagons.
Leaving the station the line runs up the deep cutting, emerging into the highly detailed Pendre complex. All the prototypical buildings and trackwork are present and the level crossing at Pendre is fully working, opening as the train approaches and stopping the moving cars along the roadway.
Continuing up the line, passing the roving sheep along the lineside, the route leads into Rhydyronen station with its sheltered platform and daffodil field before passing the caravan holiday site at Tynllwynhen
Brynglas is soon reached with its passing loop and blockpost.
After running through “Tadpole Cutting” and under Brynglas bridge, the line starts to hug the hillside climbing all the way to emerge over the Dolgoch Viaduct which spans the ravine into Dolgoch Station. Here, the route supports working water columns for replenishing the locos on their way up to Abergynolwyn.
Next Page
Home
Talyllyn for MSTS
Support
Media Clips
Installation & QA
Downloads
Route Description
How To Order
Route Description
How To Order
News
Archive News
Talyllyn for TS2017